From Delivery to Start-Up of New Equipment
A plain-language walk through the stages new industrial equipment passes through, from arrival on site to normal production, and who is responsible at each step.
Automation and Operations
Getting new equipment installed, tested and handed over.
Start here
A plain-language walk through the stages new industrial equipment passes through, from arrival on site to normal production, and who is responsible at each step.
What commissioning checklists contain, which records are handed over at start-up, and why complete documentation helps maintenance, warranty and safety.
A general overview of how old industrial equipment is safely isolated, removed and disposed of, and what plants usually plan before taking a machine out of service.
What factory acceptance tests (FAT) and site acceptance tests (SAT) check, how they differ, and why most equipment projects use both before final handover.
Why foundations, anchor bolts and grouting matter for heavy and rotating equipment, and what typically goes wrong when a machine is not supported properly.
How knowledge is passed from installers and suppliers to the operators and maintainers who will run new equipment, and what good start-up training usually covers.
How clearances, access, material flow and utilities shape where new machines should go on a plant floor, and what to check before committing to a position.
What equipment manuals and nameplates tell you, how to read common data plate fields, and why checking them before installation and repair saves problems.
A general overview of how heavy equipment is lifted and moved, why qualified riggers and manufacturer instructions matter, and what a lift plan typically covers.